Dairy Processing Facility
Tanker Bay Upgrade

 

Upgraded existing milk tanker bay unloading area by installing a key exchange system and hose loading frames to reduce manual handling risks involved with heavy transfer hoses, as well as prevent truck drive-away incidents whilst still connected.

Key capabilities of the project include pipework modifications and structural design work for elevated hose arms, and installation of proximity sensors for implementation of an CIP automation upgrade.

Previous
Previous

Dairy Site Machine Guarding Installation

Next
Next

Brewery Yeast Crop Line Upgrade