Large-Scale Brewery Main Roadway Repair
Managed the excavation and relaying of a main access road through this large brewery and installed an agricultural line to address the leaking of an existing stormwater pipe. Significant traffic management planning with a cross-functional site team was required in order to shut this road for a four-week period.
Project management and layout design was provided for the replacement of stormwater pipe alongside onsite traffic management to minimise disruptions to regular site operations. Civil and geotechnical services were consulted for analysis of soil conditions, as well as responsible environmental practices for recycling and disposal of waste materials.